<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>New York Sand and Stone</title>
	<atom:link href="http://nysandandstone.com/feed/" rel="self" type="application/rss+xml" />
	<link>http://nysandandstone.com</link>
	<description>Stone, Gravel &#38; Sand supplier servicing the NYC and Long Island market.</description>
	<lastBuildDate>Fri, 18 Nov 2011 02:27:28 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.3</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>New York Sand &amp; Stone introduce LaFarge QPR Cold Patch</title>
		<link>http://nysandandstone.com/2011/11/new-york-sand-stone-introduces-lafarges-qpr-cold-patch/</link>
		<comments>http://nysandandstone.com/2011/11/new-york-sand-stone-introduces-lafarges-qpr-cold-patch/#comments</comments>
		<pubDate>Thu, 17 Nov 2011 22:49:00 +0000</pubDate>
		<dc:creator>Tom</dc:creator>
				<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://nysandandstone.com/?p=9738</guid>
		<description><![CDATA[

QPR is available in bulk or in bags and is guaranteed in your stockpile for one year.
QPR adheres to asphalt, concrete, and steel. Open to traffic immediately &#8211; NO raveling or rutting.
QPR can be used in any temperature and in severe weather and remains workable from -5 degres F to +105 degrees F.
QPR requires NO [...]]]></description>
			<content:encoded><![CDATA[<div style="background-image: initial; background-attachment: initial; background-origin: initial; background-clip: initial; font: normal normal normal 13px/19px Georgia, 'Times New Roman', 'Bitstream Charter', Times, serif; padding: 0.6em; margin: 0px;">
<div id="_mcePaste" style="position: absolute; text-align: left; overflow: hidden; width: 1px; height: 1px; top: 0px; left: -10000px;">
<p>QPR is available in bulk or in bags and is guaranteed in your stockpile for one year.</p></div>
<div id="_mcePaste" style="position: absolute; text-align: left; overflow: hidden; width: 1px; height: 1px; top: 0px; left: -10000px;">QPR adheres to asphalt, concrete, and steel. Open to traffic immediately &#8211; NO raveling or rutting.</div>
<div id="_mcePaste" style="position: absolute; text-align: left; overflow: hidden; width: 1px; height: 1px; top: 0px; left: -10000px;">QPR can be used in any temperature and in severe weather and remains workable from -5 degres F to +105 degrees F.</div>
<div id="_mcePaste" style="position: absolute; text-align: left; overflow: hidden; width: 1px; height: 1px; top: 0px; left: -10000px;">QPR requires NO mixing, tacking or mechanical compaction.</div>
<div id="_mcePaste" style="position: absolute; text-align: left; overflow: hidden; width: 1px; height: 1px; top: 0px; left: -10000px;">QPR is a NYSDOT Approved patch repair material Item #15402.2050.</div>
<div id="_mcePaste" style="position: absolute; text-align: left; overflow: hidden; width: 1px; height: 1px; top: 0px; left: -10000px;">QPR is the material of choice for permanent repair of utility cuts, bridge deckings, and potholes.</div>
<div id="_mcePaste" style="position: absolute; text-align: left; overflow: hidden; width: 1px; height: 1px; top: 0px; left: -10000px;">QPR will be available for bulk and bag pickup at New York Sand &amp; Stones Brooklyn Navy Yard and 25th Street Facilities.</div>
<div id="_mcePaste" style="position: absolute; text-align: left; overflow: hidden; width: 1px; height: 1px; top: 0px; left: -10000px;">2/4) Colors for the logo could be black, red, and white or I am open to other options. The new logo can be something other than our initials but I want to have a $ and time budget on the quest for this item.</div>
<p style="text-align: center;"><strong><span style="font-size: medium;">NEW YORK SAND &amp; STONE </span><br />
</strong>is proud to announce that it is now carrying LAFARGE PRODUCT</p>
<p style="text-align: center;"><a title="QPR Cold Patch" href="http://WWW.QPRCOLDPATCH.COM" target="_blank"><img class="aligncenter" style="border-style: initial; border-color: initial;" title="QPR Logo" src="http://nysandandstone.com/wp-content/uploads/QPR.png" alt="QPR Logo" width="184" height="59" /></a></p>
<p style="text-align: center;"><span style="font-style: italic;"><strong><span style="color: #ff9900; font-style: normal; line-height: normal; font-size: small;">QPR</span> (Quality Pavement Repair) COLD PATCH MATERIAL</strong></span></p>
<table border="0" cellspacing="15" cellpadding="25">
<tbody>
<tr>
<td><span style="font-size: medium;"><span><span style="color: #ff9900;"><strong>QPR</strong></span></span></span> is available in bulk or in bags and is guaranteed in your stockpile for one year.<span style="font-size: medium;"><span><span style="color: #ff9900;"><strong> </strong></span></span></span></p>
<p><span style="font-size: medium;"><span><span style="color: #ff9900;"><strong>QPR</strong></span></span></span> adheres to asphalt, concrete, and steel. Open to traffic immediately NO raveling or rutting.</p>
<p><span style="font-size: medium;"><span><span style="color: #ff9900;"><strong>QPR</strong></span></span></span> can be used in any temperature and in severe weather and remains workable from -5 degres F to +105 degrees F.</p>
<p><span style="font-size: medium;"><span><span style="color: #ff9900;"><strong>QPR</strong></span></span></span> requires NO mixing, tacking or mechanical compaction.</td>
<td>
<table border="0" cellspacing="10" cellpadding="10">
<tbody>
<tr>
<td><span style="font-size: medium;"><span><span style="color: #ff9900;"><strong>QPR</strong></span></span></span> is a NYSDOT Approved patch repair material Item #15402.2050.</p>
<p><span style="font-size: medium;"><span><span style="color: #ff9900;"><strong>QPR</strong></span></span></span> is the material of choice for permanent repair of utility cuts, bridge deckings, and potholes.</p>
<p><span style="font-size: medium;"><span><span style="color: #ff9900;"><strong>QPR</strong></span></span></span> will be available for bulk and bag pickup at New York Sand &amp; Stones Brooklyn Navy Yard and 25th Street Facilities</td>
</tr>
</tbody>
</table>
</td>
</tr>
</tbody>
</table>
<p><strong> </strong><strong> </strong></p>
<table style="text-align: left; width: 584px;" border="0" align="center">
<tbody>
<tr>
<td><span style="font-size: medium;"><span><span style="color: #ff9900;"> </span></span></span>Click the link to obtain more information about <a href="http://WWW.QPRCOLDPATCH.COM" target="_blank">QPR Cold Patch</a>.</td>
</tr>
</tbody>
</table>
</div>
]]></content:encoded>
			<wfw:commentRss>http://nysandandstone.com/2011/11/new-york-sand-stone-introduces-lafarges-qpr-cold-patch/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>New York Sand and Stone and Amboy Aggregates Announce Opening of New Location</title>
		<link>http://nysandandstone.com/2010/09/new-york-sand-stoneamboy-aggregates-announce-opening-of-new-location/</link>
		<comments>http://nysandandstone.com/2010/09/new-york-sand-stoneamboy-aggregates-announce-opening-of-new-location/#comments</comments>
		<pubDate>Wed, 01 Sep 2010 19:17:43 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Company Events]]></category>

		<guid isPermaLink="false">http://nysandandstone.com/?p=9635</guid>
		<description><![CDATA[New York Sand &#38; Stone/Amboy Aggregates is proud to pronounce the opening of a new sales terminal at 1 Sheridan Blvd, Inwood, NY. A selection of our stone and sand product line will be available for pick up at this location effective September 1,2010. Please call our sales offices at (718) 596-2897 to get details [...]]]></description>
			<content:encoded><![CDATA[<p>New York Sand &amp; Stone/Amboy Aggregates is proud to pronounce the opening of a new sales terminal at 1 Sheridan Blvd, Inwood, NY. A selection of our stone and sand product line will be available for pick up at this location effective September 1,2010. Please call our sales offices at (718) 596-2897 to get details on product offering and operating hours.</p>
]]></content:encoded>
			<wfw:commentRss>http://nysandandstone.com/2010/09/new-york-sand-stoneamboy-aggregates-announce-opening-of-new-location/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Brooklyn Bridge Park</title>
		<link>http://nysandandstone.com/2009/07/brooklyn-bridge-park/</link>
		<comments>http://nysandandstone.com/2009/07/brooklyn-bridge-park/#comments</comments>
		<pubDate>Tue, 14 Jul 2009 02:12:25 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Projects]]></category>

		<guid isPermaLink="false">http://nysandandstone.com/?p=9375</guid>
		<description><![CDATA[The future 85-acre Brooklyn Bridge Park will stretch 1.3 miles along the East River from north of the Manhattan Bridge to Atlantic Avenue.  The Park includes Piers 1 &#8211; 6, each approximately the size of Bryant Park, and their uplands. Brooklyn Bridge Park will transform this underused and inaccessible stretch into a magnificent public space [...]]]></description>
			<content:encoded><![CDATA[<p><a href="http://nysandandstone.com/wp-content/uploads/Overhead-of-Pier-6-and-Uplands.jpg"><img class="alignleft size-medium wp-image-9378" title="Overhead-of-Pier-6-and-Uplands" src="http://nysandandstone.com/wp-content/uploads/Overhead-of-Pier-6-and-Uplands-300x216.jpg" alt="Overhead-of-Pier-6-and-Uplands" width="210" height="151" /></a>The future 85-acre Brooklyn Bridge Park will stretch 1.3 miles along the East River from north of the Manhattan Bridge to Atlantic Avenue.  The Park includes Piers 1 &#8211; 6, each approximately the size of Bryant Park, and their uplands. Brooklyn Bridge Park will transform this underused and inaccessible stretch into a magnificent public space filled with lawns, recreation, beaches, coves, restored habitats, playgrounds and beautifully landscaped areas.  The Park will connect visitors to the waterfront and NY Harbor in extraordinary ways with floating pathways, fishing piers, canals, paddling waters and restored wetlands.  This is the most significant park development in Brooklyn since Prospect Park was built 135 years ago.</p>
<p> </p>
<p style="text-align: center;"><img class="size-full wp-image-9380 aligncenter" title="Brooklyn Bridge Park" src="http://nysandandstone.com/wp-content/uploads/Brooklyn-Bridge-Park.jpg" alt="Brooklyn Bridge Park" width="450" height="1215" /><a href="http://nysandandstone.com/wp-content/uploads/Overhead-of-Pier-6-and-Uplands.jpg"></a></p>
]]></content:encoded>
			<wfw:commentRss>http://nysandandstone.com/2009/07/brooklyn-bridge-park/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

